TRENCH METALS IDENTIFIES PETERSON RAPIDS SHOWING ON THE HIGGINSON LAKE URANIUM PROJECT

Vancouver, Canada – September 5th, 2022 – Trench Metals Corp. (the “Company”) (TSXV: TMC, FWB: 33H2) has identified three high-value drill targets at its Gorilla Lake Uranium Project. All targets are characterized by surface uranium anomalies concurrent with fault structures, which were interpreted through an analysis of geophysical datasets. To test these targets, the Company has devised a diamond drill program consisting of up to nine 400m NQ2 holes for a total of 3600m. Road access to the targets is good and should require only minimal disturbance. The Company is preparing a permit application in support of the program.

The Company will provide updates on the development of diamond drill program as they come available.

About Trench Metals Corp

Trench Metals Corp. is a mineral exploration company with a focus on uranium. We create value for our shareholders by engaging in promising mineral exploration opportunities. Our main goal is the advancement of various projects from discovery all the way to production. This vertically integrated strategy allows Trench Metals to achieve exceptional shareholder value through the entire life-cycle of the mining process.

Trench Metals Corp. has the right to acquire a 100% interest in two highly prospective uranium project in Saskatchewan’s Athabasca Uranium district. The Higginson Lake Uranium Project which covers an area of approximately 5900 hectares and is 52 kilometers northeast of the town of Stony Rapids, which is accessible by Highway 905 and 964. The Higginson Lake Uranium Project hosts two historic drill indicated reserves, totaling 4,800,000 lbs of U308.* The Gorilla Lake Uranium Project which comprises of nearly 7000 hectares in the Northern Mining District of Saskatchewan near the Shea Creek uranium deposit. The Athabasca District is home to the highest grade of uranium deposits in the world and accounts for 18% of global uranium production.

*The historical mineral resource estimate presented above used categories that do not conform to current Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources and Mineral Reserves as outlined in National Instrument 43-101. A qualified person has not done sufficient work to classify the historical estimate as a current mineral resource and as such the Company is treating it as a historical resource estimate. Readers are cautioned that the historical mineral resource estimate does not mean or imply that economic deposits exist on the Project.

Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43- 101 and is responsible for, and has approved, the technical information contained in this release.

For further information, contact the Company at info@trenchmetals.com, or visit the Company’s website at www.trenchmetals.com.

On behalf of the Board,

Trench Metals Corp.

Simon Cheng, Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to the development of the Higginson Lake Uranium Project and other factors or information. Such statements represent the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules and regulations.